MIL-DTL-82909A (OS)
TABLE II. Pulsing profile parameter.
Pulse
Time (Second)
Pulse
Time (Second)
Number
Number
1
0.220
12
100.15
2
0.320
13
100.20
3
0.450
14
100.21
4
0.650
15
160.00
5
0.660
16
160.15
6
3.110
17
160.20
7
60.00
18
160.21
8
60.15
19
224.00
9
60.20
20
224.15
10
60.21
21
224.20
11
100.00
22
224.21
3.7 Workmanship. The battery pack shall be constructed and finished in a manner to assure compliance
with all requirements of this specification. Particular attention shall be directed to dimensions, finishes,
sealing, and assembly operations.
4. VERIFICATION
4.1 Classification of inspections.
a. First article inspection (see 4.2.1)
b. Production inspection (see 4.2.2)
c. Lot acceptance inspection (see 4.2.3)
4.2.1 First article inspection. Unless otherwise specified in the contract or purchase order (see 6.2), a
first article sample of 36 battery packs conforming to Drawing MBEU147990 shall be subjected to first
article testing. Thirty-three of these battery packs shall be expended in the tests listed in table III and three
battery packs shall be retained for investigative purposes. Any damage inflicted by the environmental
treatments which would adversely affect the performance of the item in service application shall be cause
for rejection of the first article sample. Any further production prior to notification by the contracting
agency of first article sample acceptability shall be at the contractor's risk. Failure of any battery pack to
comply with the requirements of section 3 shall be cause for rejection of the first article represented.
4.2.2 Production inspection. All production battery packs manufactured under the contract shall be
inspected and screened for defects. Battery packs failing to meet the requirements that are listed in table I
shall be rejected and removed from the lot.
4.2.3 Lot acceptance inspection. Lot acceptance inspection shall consist of the examinations and tests
specified in table IV. Failure of any sample battery pack to comply with the requirements listed in table IV
shall be cause for rejection of the lot represented. Packaging defects shall be corrected before acceptance.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business